SCALAR

Multi-Scalar Robotic Construction for Autonomous On-Site Assembly of Modular Timber Structures

In cooperation with

Description

SCALAR proposes a multi-scalar robotic construction for the autonomous on-site assembly of modular timber structures, addressing the need for breakthrough technologies in robotic construction. The project integrates a unified material-robot timber building system with a collaborative robotic platform composed of autonomous cranes, effectors and distributed mobile robots. These systems work together to assemble modular components through coordinated actions across macro, meso, and micro scales: wall and floor elements are used for the construction of new superstructures, while facade modules enable the robotic retrofitting of existing building.  

At the macro scale, retrofitted cranes (tower cranes and large-scale manipulators) manage transport and coarse positioning. At the meso scale, distributed mobile robots and effectors handle local alignment and final positioning. At the micro scale, the distributed mobile robots perform precise in-situ mechanical joining using screw connections. Prior to construction, the entire assembly process is virtually simulated, including the disassembled state, intermediate steps, and final structure, to validate sequencing, task allocation, and system behavior. All robotic components are synchronized through a shared digital control system that enables real-time coordination and safe collaboration with human supervision. The role of human operators shifts from physical assembly work to continuous supervision and control capability. A full-scale TRL4 demonstration will validate the autonomous transport, positioning, and joining of modular timber elements under representative construction conditions, focusing on the assembly of a multi-storey timber building section and a facade retrofit scenario. This will showcase a deployable and electrified solution applicable to both new constructions and building renovations.

In this project, the ICD takes on the role of project management and is resposible for Work Package 1 (WP1): Material-Robot Timber Building System and Computational Design Model. The ICD/CA is working on Micro-Services Architecture for On-Site Construction Management (WP2),  while the AIT provides the project with a Multi-Sensor Perception System for Dynamic Unstructured Scenes (WP3). The ISYS is responsible for the core robotic framework and developes a new Robotic Systems for Multi-Scalar Modular Assembly (WP4). With WP5: Multi-Robot Coordination and Control for On-Site Collaborative Assembly, they focus on the coordination of the distributed robots, the Liebherr tower crane, and the Jekko crane. Finally, the full robotic construction system will be integrated and demonstrated in a real-world TRL4 building scenario.

This project is founded via Horizon Europe - EIC Pathfinder Challenge: Towards autonomous robot collectives delivering collaborative tasks in dynamic unstructured construction environments. 

Assigned to

Luca Jung

M. Sc.

Research Assistant

This image showsAndreas Gienger

Andreas Gienger

Dr.-Ing.

Lecturer | Head of the Construction Robotics Group

To the top of the page